Client Name

L&Q

Value

£11M

Location

Haggerston

Completion Date

November 25

In partnership with

Partnering with London & Quadrant to install a new cladding system that was safer and more thermally efficient.

In partnership with

Partnering with London & Quadrant to install a new cladding system that was safer and more thermally efficient.

The project created safer, more thermally efficient homes, while protecting the unique ecology of the basin and ensuring residents remained supported throughout the works. The scheme involved the installation of a new External Wall Insulation (EWI) system, along with zinc and HPL panels, replacing outdated materials with a safer, higher‑performing façade.

The buildings — home to residents and several commercial units — remained occupied throughout, requiring detailed planning and clear communication. The team worked sensitively around the protected wildlife area within the basin, ensuring swans and surrounding biodiversity were undisturbed.

Driven by Cutting‑Edge Digital Technology

The project was delivered using Durkan’s GDPR‑compliant, fully customised Asite Information Management system.

Throughout construction, site teams used touch‑screen devices to manage and record all essential information, including:

  • Specification and design documentation
  • Variations and change control
  • Inspections and geotagged photographic evidence
  • Resident profiling and engagement
  • Sustainability and social value performance
  • Health, safety and quality audits
  • GoSee leadership visits
  • Snagging and handover

Asite supported full Golden Thread compliance, offering interactive dashboards, real‑time updates and transparent task tracking — strengthening collaboration and improving efficiency at every stage.

Overcoming Logistical Challenges

Site Compound

With limited space available, the compound was craned into position within one of the courtyards.
Investigations revealed water tanks beneath the surface, so the team engineered a raised platform solution to avoid structural loading. This eliminated the need to relocate facilities and kept the programme on schedule.

Scaffold Access

Working directly beside the canal presented unique access challenges.
In several locations, scaffold upstands spanned across water to maintain clear public access along the timber‑decked towpath. Bespoke scaffold designs ensured safe working spaces while preserving the pedestrian route and local environment.

A Culture of Best Practice

The project received praise from the Considerate Constructors Scheme (CCS), which commended the team’s proactive culture of sharing ideas, reporting observations and promoting best practice. The project proudly achieved a perfect score of 45 out of 45.

In recognition of the digital innovations used, the project team also received a commendation at the Housing Technology Awards for Digital Transformation, and was shortlisted for Digital Construction Project of the Year 2024.

Supporting the Community and Enhancing Local Biodiversity

Kingsland Basin is an ecologically rich habitat with an established swan conservation area, and biodiversity protection remained central throughout the project.

Community‑focused initiatives included:

  • Adapting construction methods to maintain ecological stability along the waterway
  • Working with local residents to verify abandoned bicycles, which were then donated to Better Health Bikes in Hackney, supporting their mental‑health‑focused vocational programmes
  • Creating a quiet onsite workspace for residents working from home, complete with desks, Wi‑Fi and refreshments