Regenerating 188 social housing properties in a busy and constrained city centre location for Soho Housing Association.
In partnership with
Regenerating 188 social housing properties in a busy and constrained city centre location for Soho Housing Association.
Regeneration in a conservation zone
In early 2023, we began work to refurbish Soho Housing Association’s Sandringham Flats, located within a conservation area on the busy Charing Cross Road. The homes, above a parade of shops and on a main transport route, needed significant repairs and upgrades. We delivered a range of services to fully renovate the buildings to create safe, warm and high-quality homes fit for the future.
Drawing on our full-service offer
Durkan Regen has 50+ years’ experience supporting local authorities and housing associations, and our one stop shop service offer sets us apart. Being able to deliver this full-service capability was important on this scheme, as a range of specialist skills and expertise were needed.
As a result of age and weathering, extensive repairs were needed to the external structure, facades and decorative elements which were original to Sandringham Flats. Our work included repairs to the roofs, drainage systems, brickwork and concrete external walls. We also replaced windows and doors to the flats, overhauled communal areas, redecorated the exterior and carried out electrical and fire safety compliance works.

We introduced new insulation and heating systems, reducing the building’s energy usage by up to 75%. This meant lower bills for residents, and we were pleased to work with the Green Doctors to provide free energy and cost saving advice as they settled into their refurbished homes.
Throughout, our designated liaison officer worked with residents to keep them up to date and help minimise impacts wherever possible. Relationships were positive and the project culminated in a resident-led community day where we all came together to bring the rooftop community room and garden back to life with new equipment, benches and planters.
With work completed in summer 2024, the building is now fully restored, offering a home to many more generations to come.
· An extensive regeneration scheme drawing on our full-service officer
· Working in a conservation zone
· Reduced energy usage by up to 75%, saving residents money
“I am happy with everything that has been done. There have been many contractors working on this building but Durkan has proved to be the best out of all of them.”